
SOLD!
2021 Hatteras 59 ft GT59 Convertible Change Order
Price
$3,199,000
Length
59 ft
Builder
Hatteras
This 2021 HATTERAS 59’ GT59 CONVERTIBLE “Change Order” is a 3 stateroom 2 head
layout with 600hrs on reliable CAT C32A engines. The engines are still under
warranty and warranty can be extended out further. All service is up to date on
engines and generators with records. The 2021 59’ HATTERAS CONVERTIBLE is loaded
with options and is in very nice condition. Call to inquire for more information
or schedule a showing on “Change Order” the 2021 HATTERAS 59’ CONVERTIBLE GT59.
HIGHLIGHTS
* CAT C32A engines with warranty until 12/7/2025 or 2000 hours.
* 2022 Garmin electronics package
* 4/2022 Electrosea system added
* 4/2022 KVH tracvision 7 HD tv added
* 4/2022 JL Audio system with speakers, subwoofer, and amplifiers added
* Two generators
* Mezzanine seating in cockpit
* Air conditioned flybridge
* Bow thruster
* Water maker
* Ice chipper
* Underwater lights
* Sirius/XM weather & radio
35 Yachts is pleased to assist you in the purchase of this vessel. This boat is
centrally listed by HMY Yacht Sales, Inc.. It is offered as a convenience by
this broker/dealer to its clients and is not intended to convey direct
representation of a particular vessel
Vessel Year:
2021
Engine Type:
Diesel
Engine Mfg:
Caterpillar
Engine Model:
C-32A
Horsepower:
1600
Engine Hours:
600 Hrs
Vessel Details
Salon:
- Satin teak woodwork throughout
- L-shaped sofa with storage underneath and pull out double berth
- Custom salon cocktail table with storage inside
- Carpeting with carpet runner
- Amtico threshold at entrance of salon door
- Samsung 40” flatscreen tv to starboard with electric lift
- Satellite tv
- Denon AV receiver
- Samsung blu ray player
- Surround sound speakers
- Sliding salon door
- 110V outlets
- Cabinet storage
- AC distribution panel
- Overhead lighting
- Rope accent lighting
Galley/Dinette:
- Amtico flooring in galley
- Peninsula galley layout with optional dinette
- Corian countertop with drop in sink with single lever faucet
- Garbage disposal
- 2 refrigeration under counter units (4 drawers total)
- Miele 4-burner cooktop
- U-line ice maker
- Storage drawers & cabinets
- Bottle storage to port
- Overhead & Rope lighting
- Microwave/convection oven covered by cabinet door
Companionway:
- Carpeting with carpet runners
- Overhead lighting
- Access to port and starboard attic storage, electric panels with lighting
- Access hatches to all bilges
- NEW 2022 Haier Washer/dryer
Master Stateroom
- Queen sized walkaround bed with storage underneath
- Carpeting
- Cedar lined hanging closet
- Nightstands with drawers
- 2 reading lamps
- Overhead lighting
- Rope lighting
- Cabinet & drawer storage
- 110V outlets
- Samsung flatscreen tv & soundbar
- Ensuite head
Master stateroom head
- Separate shower stall
- Corian countertop
- Sink with faucet and storage underneath
- Headhunter electric head
- Towel racks
- Mirror vanity with storage
- 110v outlet
- Overhead lighting
- Amtico flooring
VIP Stateroom:
- Queen sized island berth with storage underneath
- Large drawer under bed
- Cedar lined hanging locker
- Overhead lockers to port & starboard
- Flip up storage to port & starboard
- Flatscreen tv
- Overhead lighting
- Carpeting
- Overhead hatch with screen & privacy cover
- 110v outlets
- Ensuite head
VIP/Day head
- Separate shower stall
- Corian countertop
- Sink with faucet and storage underneath
- Headhunter electric head
- Towel racks
- Mirror vanity with storage
- 110v outlet
- Overhead lighting
- Amtico flooring
Starboard Bunk Stateroom
- Over/Under bed with storage under lower berth
- Carpeting
- Nightstands with storage
- Reading lamps
- Cedar lined hanging locker
- Overhead lighting
- Flatscreen tv
- 110v outlets
Tackle room
- Corian countertop
- Rod/tackle storage
- Cabinet storage
- Overhead lighting
- Amtico flooring
Flybridge
- Center island helm
- Large lounge forward of console with large freezer underneath
- Bench sea to port & starboard with storage underneath
- Air conditioning for flybridge
- Storage port & starboard forward in cabinet
- 4 cupholders forward
- 3-sided enclosure
- 5 rod rocket launcher on aft railing
- Teak helm & companion seats with footrests
- Aft LED spreader lights
- Rupp triple spreader outriggers
- Soundsystem with 6 JL Audio speakers
- Zipwake trim tab control
- Optimus steering display
- ACR spotlight control
- CAT active station display
- Fuel gauges
- Side power bow thruster
- Single lever control with thruster buttons
- Teak helm pod
Electronics:
- 2 Garmin 8617 GPSMap 17” touch screen displays
- Garmin 7” touchscreen display with C-zone system
- Garmin open array radar
- Garmin autopilot
- Icom M506 vhf radio
- 2 CAT engine displays
- Hatteras systems display
- AM/FM/SiriusXM/Bluetooth system through Garmin unit
- Satellite tv
Cockpit:
- 6 rod/ 2 cupholder/ drawer teak battle saddle
- Custom oval table that fits on battle saddle
- Mezzanine Seating with cushions
- Large freezer in mezzanine seating
- Storage in mezzanine step
- Refrigerated drink box in cockpit step by salon door
- Storage in mezzanine step to starboard
- 6 gaff holder/chamois holders under gunnel
- Saltwater/freshwater washdown
- 50 amp shorepower cord on cablemaster
- Fishbox to port with ice chipper dump
- Fishbox to starboard
- Large lazzarette, seakeeper ready
- Teak covering boards
- 6 in-gunnel rodholders
- 6 Haunch clearing rodholders
- Transom door with lift gate
- Transom Live Well with window and lights
- Eskimo Ice Machine in lazzarette
- Electric Grill in Top of Mezzanine Tackle Center
- Salon sliding door
- JL Audio speakers
- Lumitec underwater lights
Engine Room:
- Twin Caterpillar C-32A 1600HP with 600hrs
- Engine warranty until 12/7/2025 or 2,000hrs
- 2 Cummins Onan Generators 21.5KW (Port 660 hours & Starboard 630 hours)
- Electrosea system
- 2 Mach5 freshwater pumps
- Watermakers Inc watermaker
- Oil change system
- Eskimo Ice Machine
- LED Engine Room Lights
- SeaFire Fire Extinguishing System for Engine Room
- 24V DC Bilge and Sump Pumps
- Auxiliary Emergency Bilge Pump, 150GPM in Lazarette
- 20-Gallon Electric Water Heater
- Racor Fuel Filter/ Water Separator for both Engines, and Generators
- Engine Start/ Stop Switches and Hour Meter
- Automatic Battery Charger
Foredeck
- Maxwell windlass with foot control
- Anchor with chain & rope
- Anchor locker with washdown
Mechanical Disclaimer
Engine and generator hours are as of the date of the original listing and are a representation of what the listing broker is told by the owner and/or actual reading of the engine hour meters. The broker cannot guarantee the true hours. It is the responsibility of the purchaser and/or his agent to verify engine hours, warranties implied or otherwise and major overhauls as well as all other representations noted on the listing brochure.
Disclaimer
The company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A buyer should instruct his agents, or his surveyors, to investigate such details as the buyer desires validated. This vessel is offered subject to prior sale, price change or withdrawal without notice.
Listing MLS by Yachtr.com
SOLD!
Share this with
"*" indicates required fields
2020 Lagoon 64 ft 630
$2,050,000
Hilton Head, South Carolina
2019 Serenity Yachts 64 ft 64 Electric Hybrid Firefly
$1,999,900
Riviera Beach, Florida
2006 Lidgard 73 ft Custom Catamaran SOVEREIGN
$1,995,000
Gloucester, Virginia
2020 Lagoon 62 ft Catamaran SECOND WAVE
$1,995,000
Florida
2022 Aquila 54 ft 54
$1,994,995
Clearwater, Florida
2025 ILIAD Catamarans 53 ft 53S
$1,979,000
Dania Beach, Florida
2016 Fountaine Pajot 72 ft 72 Wonderlust
$1,975,000
Red Hook, Virgin Islands (US)
2012 Horizon 60 ft
$1,974,970
Ft. Lauderdale, Florida
2013 Horizon 60 ft PC60 Tranquility
$1,925,000
Naples, Florida
2022 Aquila 54 ft 54
$1,806,307
St Petersburg, Florida
2012 Horizon 59 ft PC60 Drifter
$1,800,000
Fort Lauderdale, Florida
2021 Privilege 54 ft 510 Owners Ona
$1,800,000
Mallorca, Spain
2019 Squalt Marine 64 ft CK64
$1,793,550
Saint Marteen, France
2022 Sunpower Yachts 44 ft 44
$1,750,000
Broadbeach, Queensland
2024 Leopard 53 ft
$1,750,000
Fort Lauderdale
2018 Outremer 60 ft 5X Wikiwiki
$1,728,330
Sidney, British Columbia
2025 Fountaine Pajot 50 ft Aura 51
$1,703,761
France
2023 Bali 55 ft 5.4 Dante
$1,700,000
St Thomas, Virgin Islands (US)
2024 Leopard 53 ft 53 Powercat Chillin the Most
$1,700,000
Miami Beach, Florida
2018 Horizon 52 ft PC52 MAGIC
$1,699,000
Tampa, Florida
2024 Leopard 53 ft 53 Powercat
$1,690,000
Boca raton, Florida
2020 Calcutta 51 ft 480 Catamaran
$1,650,000
Summerland Key, Florida
2014 Lagoon 62 ft
$1,595,000
Fort Lauderdale
2025 Diamond Yachts 56 ft EF63 Power Catamaran Diamond Yachts EF63 Power Catamaran
$1,500,000
Fort Lauderdale, Florida
2015 Lagoon 63 ft 620
$1,499,944
Fort Lauderdale, Florida
2013 Custom 65 ft Pacific Expedition 65 Barbara Gail
$1,499,000
Fort Lauderdale, Florida
2024 Lagoon 51 ft
$1,495,000
Marigot, Saint Martin
2013 Lagoon 62 ft 620
$1,495,000
Saint Martin
2022 Balance 48 ft
$1,495,000
Saint Augustine
2022 Fountaine Pajot 51 ft Aura 51 Endless Summer
$1,485,000
Tortola, Virgin Islands (British)
2020 Scout 53 ft 530 LXF
$1,999,999
Miami, Florida
2006 Viking 68 ft 68 Convertible HAMMER TIME
$1,999,500
Key West, Florida
2007 Viking 64 ft 64 Convertible Evil Eyes
$1,999,000
Panama City Beach, Florida
2019 Viking 48 ft 48 Sport Tower Cajun Moon
$1,995,000
Stuart , Florida
2004 Hines-Farley 66 ft Custom Convertible Whiskey Kilo
$1,950,000
Palm Beach, Florida
2022 Riviera 57 ft 575 SUV Sapphire
$1,949,000
Ft. Lauderdale, Florida
2006 Viking 74 ft 74 Enclosed Bridge KICKBACK
$1,899,000
San Diego, California
2006 Viking 74 ft Curious George
$1,899,000
Fort Lauderdale, Florida
2005 Viking 74 ft Enclosed Bridge Berry Blessed
$1,899,000
Stuart, Florida
2022 Garlington 44 ft Express Lookout
$1,895,000
Palm Beach, Florida
1997 Garlington 61 ft 61 Convertible HURRICANE
$1,895,000
Islamorada, Florida
2018 Viking 52 ft Sport Tower Family Tradition
$1,895,000
Palm Beach Gardens, Florida
1995 Revenge Performance Boats 63 ft Sportfish/Convertible Reel Joy
$1,895,000
Singer Island, Florida
2023 Custom Carolina 45 ft 45 Flybridge Anjamar
$1,875,000
Palm Beach Gardens, Florida
2010 Viking 57 ft 57 Convertible Warden Pass
$1,799,000
Cape May, New Jersey
2012 Viking 60 ft 60 Convertible Happy Ending
$1,799,000
Cabo San Lucas, Mexico
2022 Viking 44 ft 44 Sport Coupe Ima's
$1,799,000
Boca Grande , Florida
2009 Viking 60 ft 60 Sportfish Blueprint
$1,795,000
Biloxi, Mississippi
2005 Sea Force IX 82 ft Enclosed Flybridge
$1,795,000
Miami Beach, Florida
2013 Viking 55 ft 55 Convertible BEST TRAIT
$1,750,000
Orange Beach, Alabama
2007 Viking 74 ft 74 Enclosed Bridge
$1,750,000
Florida
2005 Donzi 58 ft 58 Express Legal Holiday
$1,750,000
West Palm Beach, Florida
2013 Viking 56 ft 55 Convertible Synchronicity
$1,725,000
Freeport, Texas
2008 Viking 64 ft 64 Enclosed Bridge Barefoot Drive
$1,699,000
Panama City Beach, Florida
2008 Hatteras 64 ft 64 Enclosed Bridge Aces Up
$1,699,000
Hampton, Virginia
2004 Sea Force IX 82 ft Enclosed Bridge JR
$1,699,000
Coral Gables, Florida
1992 Whiticar 58 ft Convertible Sun Times
$1,695,000
Palm Beach, Florida
2005 Ocean Yachts 73 ft 73 Super Sport Unconquered
$1,675,000
West Palm Beach, Florida
2007 Viking 74 ft Enclosed Bridge
$1,599,000
Deerfield Beach, Florida
2005 Custom Carolina 58 ft WILL RISE
$1,599,000
West Palm Beach, Florida
Contact 35 Yacht Sales
With brokers in all major harbors, our team ensures that every client shares their gratitude and tales of our successful stories. We look forward to bringing you memories that enhance your lifestyle.
Contact 35 Yachts
2021 Pershing 83 ft 8X
$6,850,000
Fort Lauderdale, Florida
2025 Windy 52 ft SR 52
$Contact For Price
Stuart, Florida
2012 Princess 54 ft V52 IL PRINCIPE
$719,000
Miami, Florida
2017 Sunseeker 51 ft San Remo
$679,000
Fort Lauderdale, Florida
2005 Formula 51 ft 48 Yacht Contributing Factor II
$200,000
Palm Beach Gardens, Florida
2023 Windy 44 ft 40 Camira SX
$799,000
Fort Lauderdale, Florida
2014 Tiara Yachts 39 ft 3900 Coronet Juice Bahr
$519,000
Long Branch, New Jersey
2012 Cruisers Yachts 38 ft 380 Express
$229,000
Saint Clair Shores, Michigan
2009 Chris-Craft 36 ft Cra-Sea Beautiful
$160,000
Glen Cove, New York
1992 Sunseeker 38 ft Martinique 38
$79,000
Sarasota, Florida
2021 Formula 38 ft 380 Super Sport Crossover OB
$999,999
Fort Lauderdale, Florida
2024 Astondoa 37 ft 377 Coupe Outboard
$849,000
Fort Lauderdale, Florida
2023 Astondoa 37 ft 377 Coupe Outboard
$Contact For Price
Fort Lauderdale, Florida
2018 Formula 37 ft 37PC
$389,000
North Palm Beach, Florida
2001 Cruisers 37 ft 3750 JUG R KNOT
$109,000
New Orleans, Louisiana
2023 Astondoa 38 ft 377 Coupe Outboard
$465,999
Fort Lauderdale, Florida
2025 Back Cove 38 ft 372
$Contact For Price
Rockland, Maine
2007 Regal 38 ft 3760 Sport yacht
$85,000
Tarpon Springs, Florida
2020 Astondoa 38 ft 377
$425,000
Miami Shores, Florida
2012 Formula 38 ft 370 SS
$185,000
Little River, South Carolina
2013 Tiara Yachts 36 ft 3600 Coronet Loophole
$279,000
North Miami Beach, Florida
1996 Sea Ray 36 ft 330DA
$28,000
Boston, Massachusetts
2021 Beneteau 36 ft
$300,000
Palm Beach Gardens, Florida
2003 Sea Ray 36 ft 360 Sundancer Make My Day
$95,000
Galveston, Texas
2021 Regal 36 ft 36XO
$575,000
Freeport, New York
2025 Beneteau 36 ft Antares 11
$Contact For Price
Fort Lauderdale, Florida
2022 Regal 37 ft 36 LX Las Brisas
$449,000
Fort Lauderdale, Florida
2021 Sea Ray 34 ft 320 Sundancer
$369,000
Mamaroneck, New York
2025 Beneteau 34 ft Flyer 10
$Contact For Price
Palm Beach, Florida
2025 Beneteau 34 ft Flyer 10
$Contact For Price
Stuart, Florida

Superyachts & Charters
2016 Sunseeker 155 ft 155 Q
$24,750,000
Palm Beach, Florida
2008 Westport 130 ft Motor Yacht ANTARES
$11,899,000
Fort Lauderdale, Florida
1992 Christensen 126 ft Tri-Deck Motor Yacht AFTERGLOW
$3,995,000
San Diego, California
2006 Tecnomar 114 ft 35 Nadara Princess Lona
$2,999,999
Ft. Lauderdale, Florida
1983 Benetti 106 ft Saint Germain
$2,780,000
Rio de Janeiro, Brazil
1993 Christensen 130 ft SWEET ESCAPE
$4,999,999
Nassau, Bahamas
1992 Admiral 90 ft
$1,391,360
Monaco
2025 ISA 262 ft
$106,526,000
Italy
2027 Nobiskrug 252 ft Lycka
$Contact For Price
Germany
2006 Delta 240 ft LAUREL
$69,500,000
West Palm Beach, Florida
2006 Hargrave 108 ft Beachfront
$4,299,000
Nassau, Bahamas
2015 Brodosplit 196 ft KATINA
$34,784,000
Croatia
1989 Oceanfast 164 ft 164 Custom High Occupancy
$6,998,000
Miami, Florida
2010 Icon 221 ft LOON
$47,500,000
Plam Beach, Florida
2009 Trinity Yachts 165 ft SAPPHIRE
$14,950,000
West Palm Beach, Florida
2022 Majesty Yachts 121 ft 120 Rocket One
$15,372,802
Naples, Italy
2022 Gulf Craft 121 ft Majesty 120 Rocket One
$15,372,802
Naples, Italy
2027 Custom 167 ft CANTU SINDERELLA
$Contact For Price
Fort Lauderdale, Florida
2002 North American Yachts and Shipbuilding 153 ft FOCUS
$9,999,000
Fort Lauderdale, Florida
2025 Tribale Yachts 120 ft 120 GRANTURISMO
$Contact For Price
Italy
2016 Hargrave 116 ft Renaissance
$7,400,000
fort lauderdale, Florida
2011 Mengi Yay 114 ft Panacea
$3,995,000
Fort Lauderdale, Florida
1993 Broward 123 ft Tri Deck Sovereign Lady
$1,699,000
Vancouver, British Columbia
2026 Majesty 175 ft 175 Available 2026
$Contact For Price
Stuart
2026 Majesty 160 ft 160 Order to Build
$Contact For Price
Stuart
2020 Majesty 140 ft 140 Checked Out
$18,995,000
Stuart
2025 Majesty Yachts 140 ft 140
$Contact For Price
Stuart, Florida
2025 Majesty 120 ft 120
$19,900,000
Stuart
2025 Majesty 120 ft 120 Majesty 120-8
$Contact For Price
Stuart
2026 Majesty 120 ft 120 Order to Build
$Contact For Price
Stuart
2023 Cruisers Yachts 52 ft
$1,990,000
Naples, Florida
2020 Cruisers Yachts 38 ft 38 GLS Perfect Day
$575,000
Cape Coral, Florida
2021 Formula 38 ft 380 SSC Happy 2 Gether
$899,888
Boca Raton, Florida
2020 Tiara Sport 38 ft 38 LX One Love
$449,900
Longboat Key, Florida
2014 Sea Ray 35 ft 350 SLX The Crabapple
$129,900
Arnold, Maryland
2018 Sea Ray 35 ft 350 SLX
$159,000
Fort Lauderdale, Florida
2016 Cobalt 32 ft 336 Lanochka
$159,000
Hollywood, Florida
2017 Cruisers Yachts 32 ft 338 South Beach Happy Ours
$199,000
Quepos, Puntarenas, Costa Rica
2017 Regal 32 ft 3200 Bowrider
$129,500
Lantana, Florida
2016 Regal 32 ft 3200 Bowrider
$199,999
Palm Beach, Florida
2022 Beneteau 32 ft GT 32 Zen AF
$399,000
Fort Lauderdale, Florida
2021 Beneteau 32 ft Flyer 10
$275,000
Fort Lauderdale, Florida
2015 Cruisers Yachts 32 ft 328 BR
$129,000
Boca Raton, Florida
2017 Sea Ray 31 ft 310 SLX
$228,950
Pt Pleasant, New Jersey
2021 Sea Ray 31 ft 310 SLX
$204,900
Greenwich, Connecticut
2016 Chaparral 30 ft 307 SSX
$119,000
Fort Lauderdale, Florida
2023 Crownline 29 ft 290 XSS
$Contact For Price
Palm Beach, Florida
2023 Crownline 29 ft E 305 XS
$Contact For Price
Palm Beach, Florida
2023 Crownline 29 ft E 305 XS
$Contact For Price
Fort Lauderdale, Florida
2023 Crownline 29 ft 290 XSS
$Contact For Price
Fort Lauderdale, Florida
2024 Crownline 28 ft 290 XSS
$150,000
Apalachicola, Florida
2024 Crownline 28 ft 290 XSS
$150,000
Stuart, Florida
2019 Chaparral 29 ft 297 SSX
$99,000
Edgewater, Maryland
2021 Cobalt 29 ft A29
$219,900
Clearwater, Florida
2022 Crownline 29 ft E305 XS
$199,000
Ocean City, Maryland
2008 Sea Ray 29 ft 290 SLX Beer Boss
$50,000
Key Biscayne, Florida
2024 Beneteau 29 ft Flyer 9 Spacedeck
$236,965
Palm Beach, Florida
2009 Cobalt 30 ft 296 Bow Rider
$84,900
Muskegon, Michigan
2020 Chaparral 27 ft 280 OSX R & R
$149,900
Palm Beach Gardens, Florida
2013 Chaparral 28 ft
$70,000
Ft Myers, Florida
2023 X Shore 26 ft Eelex 8000
$305,560
Fort Lauderdale, Florida
2023 X Shore 26 ft Eelex 8000
$305,560
Palm Beach, Florida
2023 X Shore 26 ft Eelex 8000
$315,760
Fort Lauderdale, Florida
2010 Aspen 30 ft C90
$171,792
Vancouver, British Columbia
2007 Sea Ray 29 ft 29SLX with caddy cabin
$55,093
Vancouver, British Columbia
2023 Greenline 39 ft 40 Hybrid Greenline 40
$750,000
Fort Lauderdale, Florida